The Financial and Economic Assessment of China's High Speed Rail Investments: A Preliminary Analysis
China has suffered railway capacity constraints for more than several decades and the need for a large increase in rail capacity has been viewed as the primary challenge. The former Chinese Ministry of Railways believed that building a national wide high speed railway (HSR) network was the most effi...
Gespeichert in:
Beteilige Person: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | Englisch |
Veröffentlicht: |
Paris
OECD Publishing
2013
|
Schriftenreihe: | International Transport Forum Discussion Papers
|
Schlagwörter: | |
Links: | https://doi.org/10.1787/5jrw4bdd6nvf-en |
Zusammenfassung: | China has suffered railway capacity constraints for more than several decades and the need for a large increase in rail capacity has been viewed as the primary challenge. The former Chinese Ministry of Railways believed that building a national wide high speed railway (HSR) network was the most efficient solution to China's rail capacity problems. By 2012, 9 000 km of HSR line has been completed which accounted more than half of the total in the World and the other 9 000 km HSR line is either under construction or in the planning stage. This paper attempts to discuss the initial operational, financial and economic result of such a large scale HSR investment in China where the establishment of an appraisal system for a HSR project is still underway and the public data in need are not available. Based on some trial studies carried out on several HSR projects, however, the paper shows that except for a limited amount of HSR projects in the most developed areas of the country, the initial financial and economic performance of most HSR lines are generally much poorer than expected. The scale of investment seems to be difficult to justify, given that investment in HSR lines is very expensive, especially for those with design speed of 350 km/h, and the high level of debt funding. Moreover the values of time of the ordinary Chinese are still low by European standards. For a developing country planning HSR projects, one lesson that can be learnt from China is that it would be ideal if a comprehensive appraisal can be taken into account before investing in HSR. Such appraisal includes examination of different options for technical and operational standards, timing of investment, construction scale and pace, train operational scheme and service level, pricing and regional development policy (political consideration). At the very least, a step by step development strategy should be adopted to cope with the huge uncertainties and risks |
Umfang: | 1 Online-Ressource (40 Seiten) 21 x 29.7cm |
DOI: | 10.1787/5jrw4bdd6nvf-en |
Internformat
MARC
LEADER | 00000nam a2200000zc 4500 | ||
---|---|---|---|
001 | BV047934195 | ||
003 | DE-604 | ||
007 | cr|uuu---uuuuu | ||
008 | 220413s2013 xx o|||| 00||| eng d | ||
024 | 7 | |a 10.1787/5jrw4bdd6nvf-en |2 doi | |
035 | |a (ZDB-13-SOC)061283614 | ||
035 | |a (OCoLC)1312689601 | ||
035 | |a (DE-599)BVBBV047934195 | ||
040 | |a DE-604 |b ger |e aacr | ||
041 | 0 | |a eng | |
049 | |a DE-384 |a DE-91 |a DE-473 |a DE-824 |a DE-29 |a DE-739 |a DE-355 |a DE-20 |a DE-1028 |a DE-1049 |a DE-188 |a DE-521 |a DE-861 |a DE-898 |a DE-92 |a DE-573 |a DE-19 | ||
100 | 1 | |a Wu, Jianhong |e Verfasser |4 aut | |
245 | 1 | 0 | |a The Financial and Economic Assessment of China's High Speed Rail Investments |b A Preliminary Analysis |c Jianhong Wu |
264 | 1 | |a Paris |b OECD Publishing |c 2013 | |
300 | |a 1 Online-Ressource (40 Seiten) |c 21 x 29.7cm | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
490 | 0 | |a International Transport Forum Discussion Papers | |
520 | |a China has suffered railway capacity constraints for more than several decades and the need for a large increase in rail capacity has been viewed as the primary challenge. The former Chinese Ministry of Railways believed that building a national wide high speed railway (HSR) network was the most efficient solution to China's rail capacity problems. By 2012, 9 000 km of HSR line has been completed which accounted more than half of the total in the World and the other 9 000 km HSR line is either under construction or in the planning stage. This paper attempts to discuss the initial operational, financial and economic result of such a large scale HSR investment in China where the establishment of an appraisal system for a HSR project is still underway and the public data in need are not available. Based on some trial studies carried out on several HSR projects, however, the paper shows that except for a limited amount of HSR projects in the most developed areas of the country, the initial financial and economic performance of most HSR lines are generally much poorer than expected. The scale of investment seems to be difficult to justify, given that investment in HSR lines is very expensive, especially for those with design speed of 350 km/h, and the high level of debt funding. Moreover the values of time of the ordinary Chinese are still low by European standards. For a developing country planning HSR projects, one lesson that can be learnt from China is that it would be ideal if a comprehensive appraisal can be taken into account before investing in HSR. Such appraisal includes examination of different options for technical and operational standards, timing of investment, construction scale and pace, train operational scheme and service level, pricing and regional development policy (political consideration). At the very least, a step by step development strategy should be adopted to cope with the huge uncertainties and risks | ||
650 | 4 | |a Transport | |
856 | 4 | 0 | |u https://doi.org/10.1787/5jrw4bdd6nvf-en |x Verlag |z kostenfrei |3 Volltext |
912 | |a ZDB-13-SOC | ||
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-033315689 |
Datensatz im Suchindex
DE-BY-TUM_katkey | 2630555 |
---|---|
_version_ | 1821940767637110784 |
adam_text | |
any_adam_object | |
author | Wu, Jianhong |
author_facet | Wu, Jianhong |
author_role | aut |
author_sort | Wu, Jianhong |
author_variant | j w jw |
building | Verbundindex |
bvnumber | BV047934195 |
collection | ZDB-13-SOC |
ctrlnum | (ZDB-13-SOC)061283614 (OCoLC)1312689601 (DE-599)BVBBV047934195 |
discipline | Wirtschaftswissenschaften |
doi_str_mv | 10.1787/5jrw4bdd6nvf-en |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>00000nam a2200000zc 4500</leader><controlfield tag="001">BV047934195</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">220413s2013 xx o|||| 00||| eng d</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1787/5jrw4bdd6nvf-en</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-13-SOC)061283614</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1312689601</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)BVBBV047934195</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">aacr</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-384</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-473</subfield><subfield code="a">DE-824</subfield><subfield code="a">DE-29</subfield><subfield code="a">DE-739</subfield><subfield code="a">DE-355</subfield><subfield code="a">DE-20</subfield><subfield code="a">DE-1028</subfield><subfield code="a">DE-1049</subfield><subfield code="a">DE-188</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-861</subfield><subfield code="a">DE-898</subfield><subfield code="a">DE-92</subfield><subfield code="a">DE-573</subfield><subfield code="a">DE-19</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Wu, Jianhong</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">The Financial and Economic Assessment of China's High Speed Rail Investments</subfield><subfield code="b">A Preliminary Analysis</subfield><subfield code="c">Jianhong Wu</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Paris</subfield><subfield code="b">OECD Publishing</subfield><subfield code="c">2013</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (40 Seiten)</subfield><subfield code="c">21 x 29.7cm</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="490" ind1="0" ind2=" "><subfield code="a">International Transport Forum Discussion Papers</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">China has suffered railway capacity constraints for more than several decades and the need for a large increase in rail capacity has been viewed as the primary challenge. The former Chinese Ministry of Railways believed that building a national wide high speed railway (HSR) network was the most efficient solution to China's rail capacity problems. By 2012, 9 000 km of HSR line has been completed which accounted more than half of the total in the World and the other 9 000 km HSR line is either under construction or in the planning stage. This paper attempts to discuss the initial operational, financial and economic result of such a large scale HSR investment in China where the establishment of an appraisal system for a HSR project is still underway and the public data in need are not available. Based on some trial studies carried out on several HSR projects, however, the paper shows that except for a limited amount of HSR projects in the most developed areas of the country, the initial financial and economic performance of most HSR lines are generally much poorer than expected. The scale of investment seems to be difficult to justify, given that investment in HSR lines is very expensive, especially for those with design speed of 350 km/h, and the high level of debt funding. Moreover the values of time of the ordinary Chinese are still low by European standards. For a developing country planning HSR projects, one lesson that can be learnt from China is that it would be ideal if a comprehensive appraisal can be taken into account before investing in HSR. Such appraisal includes examination of different options for technical and operational standards, timing of investment, construction scale and pace, train operational scheme and service level, pricing and regional development policy (political consideration). At the very least, a step by step development strategy should be adopted to cope with the huge uncertainties and risks</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Transport</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1787/5jrw4bdd6nvf-en</subfield><subfield code="x">Verlag</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-13-SOC</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-033315689</subfield></datafield></record></collection> |
id | DE-604.BV047934195 |
illustrated | Not Illustrated |
indexdate | 2025-01-11T15:45:42Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-033315689 |
oclc_num | 1312689601 |
open_access_boolean | 1 |
owner | DE-384 DE-91 DE-BY-TUM DE-473 DE-BY-UBG DE-824 DE-29 DE-739 DE-355 DE-BY-UBR DE-20 DE-1028 DE-1049 DE-188 DE-521 DE-861 DE-898 DE-BY-UBR DE-92 DE-573 DE-19 DE-BY-UBM |
owner_facet | DE-384 DE-91 DE-BY-TUM DE-473 DE-BY-UBG DE-824 DE-29 DE-739 DE-355 DE-BY-UBR DE-20 DE-1028 DE-1049 DE-188 DE-521 DE-861 DE-898 DE-BY-UBR DE-92 DE-573 DE-19 DE-BY-UBM |
physical | 1 Online-Ressource (40 Seiten) 21 x 29.7cm |
psigel | ZDB-13-SOC |
publishDate | 2013 |
publishDateSearch | 2013 |
publishDateSort | 2013 |
publisher | OECD Publishing |
record_format | marc |
series2 | International Transport Forum Discussion Papers |
spellingShingle | Wu, Jianhong The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis Transport |
title | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis |
title_auth | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis |
title_exact_search | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis |
title_full | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis Jianhong Wu |
title_fullStr | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis Jianhong Wu |
title_full_unstemmed | The Financial and Economic Assessment of China's High Speed Rail Investments A Preliminary Analysis Jianhong Wu |
title_short | The Financial and Economic Assessment of China's High Speed Rail Investments |
title_sort | the financial and economic assessment of china s high speed rail investments a preliminary analysis |
title_sub | A Preliminary Analysis |
topic | Transport |
topic_facet | Transport |
url | https://doi.org/10.1787/5jrw4bdd6nvf-en |
work_keys_str_mv | AT wujianhong thefinancialandeconomicassessmentofchinashighspeedrailinvestmentsapreliminaryanalysis |