The Effects of Country Risk and Conflict on Infrastructure PPPs:
Through an empirical analysis of the relationship between private participation in infrastructure and country risk, the paper shows that country risk ratings are a reliable predictor of infrastructure investment levels in developing countries. The results suggest that a difference of one standard de...
Gespeichert in:
Beteilige Person: | |
---|---|
Format: | Elektronisch E-Book |
Sprache: | Englisch |
Veröffentlicht: |
Washington, D.C
The World Bank
2013
|
Links: | https://doi.org/10.1596/1813-9450-6569 |
Zusammenfassung: | Through an empirical analysis of the relationship between private participation in infrastructure and country risk, the paper shows that country risk ratings are a reliable predictor of infrastructure investment levels in developing countries. The results suggest that a difference of one standard deviation in a country's sovereign risk score is associated with a 27 percent increase in the probability of having a private participation in infrastructure commitment, and a 41 percent higher level of investment in dollar terms. The predictive ability of country risk ratings exists for all sectors of infrastructure and for both greenfield and concessions. On average, energy investments exhibit a higher sensitivity to country risk than transport, telecommunications, and water investments. Concessions are more sensitive than greenfield investments to country risk, although country risk is a good predictor of investment levels for both contractual forms. Although foreign direct investment is found to be sensitive to country risk, the causal relationship is not nearly as sensitive as it is with private participation in infrastructure. Finally, an analysis of private participation in infrastructure patterns for those countries emerging from conflict reveals that conflict-affected countries typically require six to seven years to attract significant levels or forms of private investments in infrastructure from the day that the conflict is officially resolved. Private investments in sectors where assets are more difficult to secure-such as water, power distribution, or roads-are slower to appear or simply never materialize |
Umfang: | 1 Online-Ressource (28 p) |
DOI: | 10.1596/1813-9450-6569 |
Internformat
MARC
LEADER | 00000nam a2200000zc 4500 | ||
---|---|---|---|
001 | BV048266004 | ||
003 | DE-604 | ||
005 | 00000000000000.0 | ||
007 | cr|uuu---uuuuu | ||
008 | 220609s2013 xx o|||| 00||| eng d | ||
024 | 7 | |a 10.1596/1813-9450-6569 |2 doi | |
035 | |a (ZDB-1-WBA)NLM010336591 | ||
035 | |a (OCoLC)1334061339 | ||
035 | |a (DE-599)GBVNLM010336591 | ||
040 | |a DE-604 |b ger |e rda | ||
041 | 0 | |a eng | |
049 | |a DE-12 |a DE-521 |a DE-573 |a DE-523 |a DE-Re13 |a DE-19 |a DE-355 |a DE-703 |a DE-91 |a DE-706 |a DE-29 |a DE-M347 |a DE-473 |a DE-824 |a DE-20 |a DE-739 |a DE-1043 |a DE-863 |a DE-862 | ||
100 | 1 | |a Araya, Gonzalo |e Verfasser |4 aut | |
245 | 1 | 0 | |a The Effects of Country Risk and Conflict on Infrastructure PPPs |c Gonzalo Araya |
264 | 1 | |a Washington, D.C |b The World Bank |c 2013 | |
300 | |a 1 Online-Ressource (28 p) | ||
336 | |b txt |2 rdacontent | ||
337 | |b c |2 rdamedia | ||
338 | |b cr |2 rdacarrier | ||
520 | |a Through an empirical analysis of the relationship between private participation in infrastructure and country risk, the paper shows that country risk ratings are a reliable predictor of infrastructure investment levels in developing countries. The results suggest that a difference of one standard deviation in a country's sovereign risk score is associated with a 27 percent increase in the probability of having a private participation in infrastructure commitment, and a 41 percent higher level of investment in dollar terms. The predictive ability of country risk ratings exists for all sectors of infrastructure and for both greenfield and concessions. On average, energy investments exhibit a higher sensitivity to country risk than transport, telecommunications, and water investments. Concessions are more sensitive than greenfield investments to country risk, although country risk is a good predictor of investment levels for both contractual forms. Although foreign direct investment is found to be sensitive to country risk, the causal relationship is not nearly as sensitive as it is with private participation in infrastructure. Finally, an analysis of private participation in infrastructure patterns for those countries emerging from conflict reveals that conflict-affected countries typically require six to seven years to attract significant levels or forms of private investments in infrastructure from the day that the conflict is officially resolved. Private investments in sectors where assets are more difficult to secure-such as water, power distribution, or roads-are slower to appear or simply never materialize | ||
700 | 1 | |a Araya, Gonzalo |4 oth | |
700 | 1 | |a Schwartz, Jordan |4 oth | |
700 | 1 | |a Andres, Luis |4 oth | |
776 | 0 | 8 | |i Araya, Gonzalo |a The Effects of Country Risk and Conflict on Infrastructure PPPs |
856 | 4 | 0 | |u https://doi.org/10.1596/1813-9450-6569 |x Verlag |z kostenfrei |3 Volltext |
912 | |a ZDB-1-WBA | ||
943 | 1 | |a oai:aleph.bib-bvb.de:BVB01-033646198 |
Datensatz im Suchindex
DE-BY-TUM_katkey | 2817224 |
---|---|
_version_ | 1821937175182180352 |
any_adam_object | |
author | Araya, Gonzalo |
author_facet | Araya, Gonzalo |
author_role | aut |
author_sort | Araya, Gonzalo |
author_variant | g a ga |
building | Verbundindex |
bvnumber | BV048266004 |
collection | ZDB-1-WBA |
ctrlnum | (ZDB-1-WBA)NLM010336591 (OCoLC)1334061339 (DE-599)GBVNLM010336591 |
discipline | Wirtschaftswissenschaften |
doi_str_mv | 10.1596/1813-9450-6569 |
format | Electronic eBook |
fullrecord | <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02909nam a2200349zc 4500</leader><controlfield tag="001">BV048266004</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">00000000000000.0</controlfield><controlfield tag="007">cr|uuu---uuuuu</controlfield><controlfield tag="008">220609s2013 xx o|||| 00||| eng d</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1596/1813-9450-6569</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ZDB-1-WBA)NLM010336591</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)1334061339</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVNLM010336591</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="0" ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-12</subfield><subfield code="a">DE-521</subfield><subfield code="a">DE-573</subfield><subfield code="a">DE-523</subfield><subfield code="a">DE-Re13</subfield><subfield code="a">DE-19</subfield><subfield code="a">DE-355</subfield><subfield code="a">DE-703</subfield><subfield code="a">DE-91</subfield><subfield code="a">DE-706</subfield><subfield code="a">DE-29</subfield><subfield code="a">DE-M347</subfield><subfield code="a">DE-473</subfield><subfield code="a">DE-824</subfield><subfield code="a">DE-20</subfield><subfield code="a">DE-739</subfield><subfield code="a">DE-1043</subfield><subfield code="a">DE-863</subfield><subfield code="a">DE-862</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Araya, Gonzalo</subfield><subfield code="e">Verfasser</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">The Effects of Country Risk and Conflict on Infrastructure PPPs</subfield><subfield code="c">Gonzalo Araya</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Washington, D.C</subfield><subfield code="b">The World Bank</subfield><subfield code="c">2013</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">1 Online-Ressource (28 p)</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Through an empirical analysis of the relationship between private participation in infrastructure and country risk, the paper shows that country risk ratings are a reliable predictor of infrastructure investment levels in developing countries. The results suggest that a difference of one standard deviation in a country's sovereign risk score is associated with a 27 percent increase in the probability of having a private participation in infrastructure commitment, and a 41 percent higher level of investment in dollar terms. The predictive ability of country risk ratings exists for all sectors of infrastructure and for both greenfield and concessions. On average, energy investments exhibit a higher sensitivity to country risk than transport, telecommunications, and water investments. Concessions are more sensitive than greenfield investments to country risk, although country risk is a good predictor of investment levels for both contractual forms. Although foreign direct investment is found to be sensitive to country risk, the causal relationship is not nearly as sensitive as it is with private participation in infrastructure. Finally, an analysis of private participation in infrastructure patterns for those countries emerging from conflict reveals that conflict-affected countries typically require six to seven years to attract significant levels or forms of private investments in infrastructure from the day that the conflict is officially resolved. Private investments in sectors where assets are more difficult to secure-such as water, power distribution, or roads-are slower to appear or simply never materialize</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Araya, Gonzalo</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Schwartz, Jordan</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Andres, Luis</subfield><subfield code="4">oth</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Araya, Gonzalo</subfield><subfield code="a">The Effects of Country Risk and Conflict on Infrastructure PPPs</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1596/1813-9450-6569</subfield><subfield code="x">Verlag</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-WBA</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-033646198</subfield></datafield></record></collection> |
id | DE-604.BV048266004 |
illustrated | Not Illustrated |
indexdate | 2024-12-20T19:40:08Z |
institution | BVB |
language | English |
oai_aleph_id | oai:aleph.bib-bvb.de:BVB01-033646198 |
oclc_num | 1334061339 |
open_access_boolean | 1 |
owner | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
owner_facet | DE-12 DE-521 DE-573 DE-523 DE-Re13 DE-BY-UBR DE-19 DE-BY-UBM DE-355 DE-BY-UBR DE-703 DE-91 DE-BY-TUM DE-706 DE-29 DE-M347 DE-473 DE-BY-UBG DE-824 DE-20 DE-739 DE-1043 DE-863 DE-BY-FWS DE-862 DE-BY-FWS |
physical | 1 Online-Ressource (28 p) |
psigel | ZDB-1-WBA |
publishDate | 2013 |
publishDateSearch | 2013 |
publishDateSort | 2013 |
publisher | The World Bank |
record_format | marc |
spellingShingle | Araya, Gonzalo The Effects of Country Risk and Conflict on Infrastructure PPPs |
title | The Effects of Country Risk and Conflict on Infrastructure PPPs |
title_auth | The Effects of Country Risk and Conflict on Infrastructure PPPs |
title_exact_search | The Effects of Country Risk and Conflict on Infrastructure PPPs |
title_full | The Effects of Country Risk and Conflict on Infrastructure PPPs Gonzalo Araya |
title_fullStr | The Effects of Country Risk and Conflict on Infrastructure PPPs Gonzalo Araya |
title_full_unstemmed | The Effects of Country Risk and Conflict on Infrastructure PPPs Gonzalo Araya |
title_short | The Effects of Country Risk and Conflict on Infrastructure PPPs |
title_sort | the effects of country risk and conflict on infrastructure ppps |
url | https://doi.org/10.1596/1813-9450-6569 |
work_keys_str_mv | AT arayagonzalo theeffectsofcountryriskandconflictoninfrastructureppps AT schwartzjordan theeffectsofcountryriskandconflictoninfrastructureppps AT andresluis theeffectsofcountryriskandconflictoninfrastructureppps |